Skip to content

Brisk Olive

Menu
  • Home
  • Expert Execution Services
  • Recruitment Services
  • Our Products
    • Anti-Skid Coating Solution
  • Downloads
  • Blog
  • About
  • Contact
Contact Us

The Only Strolley Bridge in the World!

Bridge Modules Stacked in Vehicle

Pull the Bridge Modules to the Bridge Site like a Strolley

Carry the Modules Overhead or Under-slung for Unduly Terrains

Connect Modules without Tools

Unique Design

New
    1. The bridge is made up of identical modules.
    2. Each module is like a wheeled trolley.
    3. A module swivels open into 2.5 metre bridge span.
    4. Spans are connected together – using zero tools – to build bridge of varied spans.

Amazing Features for Defence, Disaster Response & Instant Bridging

 

  1. Span: Up to 50-metre
  2. Current: Up to 3-knots
  3. Super easy transportation: Modules get stacked on top of another
  4. Wheelbarrow: Unload and pull to bridge site like stroller
  5. Option to carry: 2-men can carry a module in undulating terrain
  6. Zero Tools: No tools needed
  7. Unsinkable floats: Remains very stable even after damage
  8. Combat worthy: Extremely rugged
  9. Minimum Training to launch / de-launch
  10. Multiple persons can cross the bridge simultaneously.
  11. Prolonged deployment can be done.
  12. Swivel, connect and launch the module at the bridge site
Contact Us

Tested to Float despite small firearms

Variants

Military

This bridge is specially designed for infantry and other dismounted troops to launch an assault across a water obstacle.

Disaster Response

During disasters, the young and old use the bridge too. This bridge has a wider trackway, metal handrails and higher buoyancy.

Events & Communities

The bridge could be deployed for long for community use. It has metal handrails, more buoyancy and Strengtheners.

Technical Specifications

Screenshot 2024-12-13 151146
Technical Specifications
  1. Span per Module: 2.5-metre
  2. Bridge Span: Up to 50-metre
  3. Weight per Module: <= 80kg
  4. Trackway Width: 600mm
  5. Max Water Current: 3-knots
  6. Life: 20 years / 500 launches
  7. Construction Time (50m bridge):
    • Maximum 30 minutes by day
    • Maximum 45 minutes by night
Design & Materials
  1. 100% recyclable structural components.
  2. High strength aerospace grade aluminum alloys.
  3. Anti-skid pathway for rapid crossing and maximum safety.
  4. Fire and chemical resistant materials.
  5. Wide operating temperature range.

Certifications

Certifications
  1. Altitude Test: MIL Standard
  2. Corrosion Test: ASTM Standard
  3. UV Test: ASTM Standard
  4. Anti-Skid Test: ASTM & IS Standard
  5. Successfully cleared rigorous user trials (SSCT) by the Indian Army
  6. Contact for information on additional tests

Recognition

Recognized by high-ranking army officials and Political Leaders including
  1. Honourable Prime Minister Shri Narendra Modi.
  2. Defence Minister Shri Rajnath Singh.
  3. Former Chief of Army Staff Gen. Manoj Pande, PVSM, AVSM, VSM.
Brochure
Contact Us
Launch Video
Demo Video

Brisk Olive

We help companies grow massively across India through India’s largest and most reliable Field Force of 40,000+ ex-soldiers.

Facebook Twitter Instagram Linkedin

Quick Links

  • Home
  • Expert Execution Services
  • Recruitment Services
  • Our Products
    • Anti-Skid Coating Solution
  • Downloads
  • Blog
  • About
  • Contact

USEFUL LINKS

  • Our Products
    • Rapid Foldable Floating Foot Bridge
    • Anti-Skid Coating Solution
  • Members Intro
    • Open Jobs & Projects
  • Contact
  • Disclaimer
  • Privacy Policy

Contact Us

  • +91 7060162717
  • info@briskolive.com
  • Monday/Friday: 9 am to 5 pm
    Saturday & Sundays: Family Time

© 2026 Brisk OliveBusiness Solutions Pvt Ltd.

Designed By PCG Designer

Scroll to top
Hello Brisk Olive