Defence-Grade Bridging Solution
Rapid Foldable
Floating Foot Bridge
for Defence, Disaster
& Remote Operations
The Brisk Olive Rapid Foldable Floating Foot Bridge is a high-performance portable bridging system engineered for rapid deployment in challenging terrains — rivers, canals, flood zones, and border areas.

30 min
Deployment Time
DRDO
Certified
BIS
Tested
ISO
9001:2015
Patented
Technology
5+
Year Warranty
The Problem
- Existing bridges are damaged or destroyed in conflict zones and flood areas
- Traditional bridging takes days to deploy with heavy machinery
- High cost of permanent bridge construction in remote areas
- Safety risks for personnel crossing unstable water bodies
How We Solve The Problem
- Deploys a fully functional crossing in under 30 minutes
- Requires only 4 personnel — no heavy equipment needed
- Modular design adapts to any span length requirement
- Enhances operational safety and mission success rate
Benefits For Your Operations
Rapid Deployment
Operational crossing in under 30 minutes by just 4 personnel without heavy equipment
30min
Deployment Time
Military-Grade Durability
Aircraft-grade aluminium alloy construction tested to Indian Army specifications
3X
Stronger Than Steel Alternatives
High Load Capacity
Supports heavy infantry equipment and light vehicles with confidence
≥ 500kg/m²
Load Capacity
All-Weather Performance
Operates reliably in extreme temperatures, monsoon, and saltwater environments
-20°Cto +55°C
Operating Range
Compact & Portable
Folds into compact sections that fit in a standard 1-tonne military transport vehicle
1T
Transport Vehicle
Lower Lifecycle Cost
Reusable modular design reduces long-term infrastructure investment significantly
50%
Lower Maintenance
Tool-Free Assembly
Quick-connect pin-and-latch joints allow assembly without any tools or training
30%
Faster Assembly
Long Service Life
Corrosion-resistant coating and premium materials ensure decades of reliable use
5+Years
Warranty
Ideal For

Military Operations

Disaster Relief

Remote Area Access
Rapid Foldable Bridge Variants
STANDARD GRADE
For infantry and light operations
Engineered for rapid infantry crossings and light equipment transport in field conditions.
- 10-metre span
- 500 kg/m² load capacity
- Deploys in 20 minutes
- Weight: 280 kg
EXTENDED GRADE
For heavy equipment and vehicles
Built for heavier operational demands including light vehicles and heavy equipment transport.
- 20-metre span
- 750 kg/m² load capacity
- Deploys in 35 minutes
- Weight: 520 kg
HEAVY DUTY GRADE
For disaster relief and civil use
Maximum capacity configuration for heavy military vehicles, disaster relief, and civil infrastructure.
- 30-metre span
- 1000 kg/m² load capacity
- Deploys in 50 minutes
- Weight: 780 kg
Performance Highlights
500 kg/m²
Load Capacity
3 m/s
Water Current Tolerance
-20°C to +55°C
Operating Temperature
20–50 min
Deployment Time
5+ Years
Service Life
Testing & Certifications
DRDO
Certified
Defence Research & Development Organisation, India
BIS
Tested
Bureau of Indian Standards IS 13360
ISO
9001:2015
Quality Management System Certified
Patented
Technology
Registered intellectual property protection
Interested in the Rapid Foldable Floating Foot Bridge?
Contact us for pricing, custom configurations, demonstration requests, and brochure download.